If you’re reading this, it probably sounds like this
- “Is this a fair price, or am I getting taken?”
- “The two quotes don’t even list the same things.”
- “The salesman said the discount was only good if I signed that night.”
- “I don’t want to sit through another two-hour presentation just to get a second number.”
You’re right to check. A roof is one of the biggest repairs a house gets, and a quote is only as good as what it actually includes.
7 things to check before you sign
Put your quote next to this list. Anything it doesn’t answer in writing is a question to ask before you sign.
Is it a full tear-off?
Every layer of old roofing removed down to the deck, with the dumpster and disposal in the price. Shingling over an old layer is cheaper now and hides problems you’ll pay for later.
Ask them: Are you removing every layer, and is disposal included?
What happens if the decking is rotten?
Every older roof has some. A good quote says how many damaged sheets are included and what each extra sheet costs. Ours lists both before you sign, and an extra sheet is about $135.
Ask them: How many sheets are included, and what’s the price per extra sheet?
Exactly which shingles?
The manufacturer, the product line and the color, by name. “Architectural shingles” on its own could mean several products at very different prices.
Ask them: Which shingle line, exactly?
Get My Roofing EstimateReady to see your number?
See what a new roof costs on your house, from aerial measurement, before anyone comes out.
Where does the ice and water shield go?
Code requires it at the eaves. Better installs also run it through the valleys and around chimneys and vents, or over the whole roof. It’s the layer that stops ice dams from becoming leaks.
Ask them: How far up from the eaves does it run, and where else does it go?
Is the flashing new or reused?
Chimney, wall and skylight flashing is where many leaks start. Reusing old flashing saves time on the job. Replacing it is the durable fix.
Ask them: Is the chimney flashing replaced or reused? Are all the pipe boots new?
How will the attic breathe?
Ventilation affects how long shingles last and whether you get ice dams. A ridge vent, or a plan for the existing vents, should be written in.
Ask them: How will the attic be ventilated?
Is the paperwork right?
Connecticut requires a written contract with the contractor’s registration number, start and completion dates, and your right to cancel. The permit and a written workmanship warranty belong in it too.
Ask them: What’s your Connecticut registration number? Then look it up online.
Quote checker
Check your quote in two minutes
Go down the list with your quote in hand. For each line, does your quote say it in writing?
1.Full tear-off down to the deck, with disposal included
2.The exact shingle manufacturer and product line
3.Synthetic underlayment over the whole roof
4.Where the ice and water shield goes
5.New chimney and wall flashing, not reused
6.Pipe boots and vents replaced
7.A plan for attic ventilation
8.Damaged decking sheets included, and the price per extra sheet
9.What a second layer of shingles would add
10.The building permit and the town’s sign-off
11.Cleanup and a magnetic nail sweep
12.A written workmanship warranty, separate from the manufacturer’s
13.A start date and a completion date
14.The contractor’s Connecticut registration number
Answer a line to see what to ask about.